Monday, November 10, 2014

Tree house [part two]

The tree house/swing set is a work in progress.
During the first phase, the first level was attached with slide, and the beam for the swing set was put up.

So over the course of the summer and into the fall the following progress has been made...

..stairs leading up to the first level.

A super helpful 1 year old was manning the drill.



Railing was put up all the way around.


Further additions to prepare for the second level.



A pulley was added on Christian's birthday, from Grandpa and Grandma.


 A handrail was placed (made from an old trampoline frame)


Netting for the stairs.


More progress towards the second level.



Bracing the joint for the swing set differently...and added hooks for swings.


No comments: